arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
Sept. 8 –
Overlay of new pavement and re-striping of traffic lanes will begin tonight. Assuming no weather-related delays, this work is expected to take about a week to complete. To minimize impacts on traffic during the day, crews will work at night as long as temperatures remain warm enough for the successful application of the asphalt. Please drive carefully and observe lane closures in the inside (left) northbound lane as the paving crew works through this section.

Night work on Riverdale Road – Night work to install a short section of pipe across Riverdale Rd. at approximately 1700 West has been suspended to allow UDOT to finish repaving work along Riverdale Road. Crews are expected to return to this location to complete tie-in work near the end of September.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
Aug. 26 –
Crews have completed installation of new pipe in this section. Overlay of new pavement and re-striping of traffic lanes will begin Sept. 8 and take about a week to complete. Work is scheduled to take place at night as long as temperatures remain warm enough for the successful application of the asphalt. Please drive carefully and observe lane closures in the inside (left) northbound lane as the paving crew works through this section.

Night work on Riverdale Road – Night work to install a short section of pipe across Riverdale Rd. at approximately 1700 West has been suspended to allow UDOT to finish repaving work along Riverdale Road. Crews are expected to return to this location to complete tie-in work near the end of September.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
Aug. 18 –
Crews have completed installation of new pipe in this section. Overlay of new pavement and re-striping of traffic lanes will begin Sept. 7 and take about a week to complete. Please drive carefully and observe lane closures in the inside (left) northbound lane as the paving crew works through this section.

Night work on Riverdale Road – Night work to install a short section of pipe across Riverdale Rd. at approximately 1700 West has been suspended to allow UDOT to finish repaving work along Riverdale Road. Crews are expected to return to this location to complete tie-in work near the end of September.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
Aug. 4 –
Crews have completed installation of new pipe in this section. All construction equipment and traffic restrictions have been removed and work zones cleaned and swept in advance of the Roy City Days parade scheduled for this Saturday, Aug. 7.

Night work on Riverdale Road – For the next three to four weeks a night crew will be working to install a short section of pipe across Riverdale Rd. at approximately 1700 West. Work will take place weeknights only between the hours of 7 p.m. and 6 a.m. to avoid impacting rush-hour traffic. Traffic flow during construction hours will be maintained in both directions, but occasional lane restrictions can be expected.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
July 1, 2010 --
Main line construction between major intersections on 1900 West from Riverdale Rd. to Hinckley Dr. is complete. Crews are now focusing on night work at the intersection of 4400 South between the hours of 7 p.m. and 6:30 a.m. to avoid impacts on rush-hour traffic. During construction hours, drivers can expect lane restrictions and possible intermittent lanes closures at 4400 South at 1900 West.

July 4th Weekend Update – The night crew at 4400 South will suspend work during the holiday weekend. Work will end Friday morning and resume Monday evening.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
June 23, 2010 --
Main line construction between major intersections on 1900 West from Riverdale Rd. to Hinckley Dr. is expected to be completed this week. Lane closures and left-turn restrictions (northbound and southbound) are in effect in the work zone, so continue to drive carefully in this area and obey all traffic control signs.

Night Work – Crews are trenching and installing pipe across the 4800 South intersection. Work is occurring at night between the hours of 7 p.m. and 6:30 a.m. to avoid impacts on rush-hour traffic. During construction hours, drivers can expect lane restrictions and possible intermittent lanes closures eastbound and westbound on 4800 South at 1900 West.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
June 10, 2010 --
Main line construction continues on 1900 West between Riverdale Rd. and Hinckley Dr. proceeding south to north with most work occurring in the inside northbound lane. Crews are maintaining a rolling work zone of approximately 2,500 feet. Lane closures and left-turn restrictions (northbound and southbound) are in effect in the work zone. The northbound right-hand (outside) lane remains open allowing for right turns into businesses and residences. Please drive carefully in this area and obey all traffic control signs. Construction to install the new pipeline is expected to be completed by mid-August.

Next Tuesday, a crew is scheduled to complete repaving the northbound lanes of 1900 West in front of the Roy Dental Center parking lot at 4902 South where new pipe has been installed. Lane restrictions at this location will be lifted when the paving is finished.

Night Work – Has been delayed but is scheduled to begin this Sunday when crews begin trench work and installation of pipe across the 4800 South intersection. Work will be conducted at night between the hours of 7 p.m. and 6:30 a.m. to avoid impacts on rush-hour traffic. During construction hours, drivers can expect lane restrictions and possible intermittent lanes closures eastbound and westbound on 4800 South at 1900 West.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
June 2, 2010 --
Main line construction continues on 1900 West between Riverdale Rd. and Hinckley Dr. proceeding south to north with most work occurring in the inside northbound lane. Crews are maintaining a rolling work zone of approximately 2,500 feet. Lane closures and left-turn restrictions (northbound and southbound) are in effect in the work zone. The northbound right-hand (outside) lane remains open allowing for right turns into businesses and residences. Please drive carefully in this area and obey all traffic control signs. Construction to install the new pipeline is expected to be completed by mid-August.

This weekend a crew is scheduled to install pipe across the northbound lanes of 1900 West between the Roy Dental Center parking lot at 4902 South and the median. Expect lane restrictions in this work zone.

Night Work – On Wednesday, June 9, crews are scheduled to begin trench work and installation of pipe across the 4800 South intersection. Work will be conducted at night between the hours of 7 p.m. and 6:30 a.m. to avoid impacts on rush-hour traffic. During construction hours, drivers can expect lane restrictions and possible intermittent lanes closures eastbound and westbound on 4800 South at 1900 West.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
May 26, 2010 --
Main line construction continues on 1900 West between Riverdale Rd. and Hinckley Dr. proceeding south to north with most work occurring in the inside northbound lane. Crews are maintaining a rolling work zone of approximately 2,500 feet. Lane closures and left-turn restrictions (northbound and southbound) are in effect in the work zone. The northbound right-hand (outside) lane remains open allowing for right turns into businesses and residences. Please drive carefully in this area and obey all traffic control signs. Construction to install the new pipeline is expected to be completed by mid-August. Memorial Day Holiday – Crews will be off Monday, May 31, in observance of Memorial Day. Work will shut down at noon this Friday and resume Tuesday morning, June 1.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
May 12, 2010 --
Crews have begun main line construction on 1900 West between Riverdale Rd. and Hinckley Dr. Construction will proceed south to north with most work occurring in the inside northbound lane. Crews are maintaining a rolling work zone of approximately 2,500 feet. Lane closures and left-turn restrictions (northbound and southbound) are in effect in the work zone. The northbound right-hand (outside) lane remains open allowing for right turns into businesses and residences. Please drive carefully in this area and obey all traffic control signs. Construction to install the new pipeline is expected to be completed by mid-August.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
April 30 2010 --
On May 10, crews will begin construction to replace the section of buried pipeline on 1900 West between Riverdale Rd. and Hinckley Dr. Construction will proceed south to north with most work occurring in the inside northbound lane. Crews will maintain a rolling work zone of approximately 2,500 feet. Lane closures and left-turn restrictions (northbound and southbound) will be in effect in the work zone. The northbound right-hand lane will remain open allowing for right turns into businesses and residences. Please drive carefully in this area and obey all traffic control signs. Construction to install the new pipeline is expected to be completed by mid-August.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
April 14 2010 --
Crews continue to locate buried utilities in preparation to begin pipeline construction on 1900 West. Temporary lane closures and possible left-turn restrictions (except in intersections) remain in effect daily between 9 a.m. and 3:30 p.m. in the northbound left traffic lane. The northbound right lane remains open between intersections and for right turns and thru traffic at intersections. Please drive carefully in this area and obey all traffic control signs. Weather permitting, major construction to install the new pipeline is scheduled to begin the week of April 26.

Excavation is underway to replace the section of pipe in the right-of-way between the Royal Gardens Apartments and the Berwick Townhomes. Installation of the new pipe in this section is expected to take about four weeks to complete.

arrow Roy City/1900 West from Riverdale Road to Hinckley Drive
April 7 2010 --
Crews continue to locate buried utilities in preparation to begin pipeline construction on 1900 West. Temporary lane closures and possible left-turn restrictions (except in intersections) remain in effect daily between 9 a.m. and 3:30 p.m. in the northbound left traffic lane. The northbound right lane remains open between intersections and for right turns and thru traffic at intersections. Please drive carefully in this area and obey all traffic control signs.

Next week a crew will begin excavation to replace the section of pipe in the right-of-way between the Royal Gardens Apartments and the Berwick Townhomes. Workers will erect a “safety” fence around the entire construction area. Installation of the new pipe in this section is expected to take about four weeks to complete.

arrow March 29, 2010 - Beginning March 29, crews will begin taking soil samples in major intersections starting at 4800 South. Expect center-lane closures northbound through affected intersections between 9 a.m. and 3:30 p.m. There will be no left- or right-turn restrictions northbound in affected intersections.

arrow March 17, 2010 - Roy City: 1900 West from Riverdale Rd. to Hinckley Dr. – Beginning Mar. 18 and for the next three weeks, crews will be working near the median on the northbound side of the road at various locations to locate buried utilities in preparation to begin pipeline construction in this corridor. Expect temporary lane closures and possible left-turn restrictions daily between 9 a.m. and 3:30 p.m. in the northbound left traffic lane. The northbound right lane will remain open. Please drive carefully in this area and obey all traffic control signs.