 Weekly Updates

arrow Oct 3, 2008 UPDATE

ALERT!
24-HOUR LANE RESTRICTIONS ON 3500 SOUTH BETWEEN 5600 WEST AND 6000 WEST: Effective Monday, Sept. 22, traffic in this section will alternate ONE-WAY ONLY EB and WB. Traffic in each direction will be regulated by a timed, electronic flagger and limited to ONE-WAY only in both directions. Expect substantial delays. Choose alternate routes, if possible. These restrictions will be in effect 24-hours until Oct. 17.

8000 WEST BETWEEN 2600 SOUTH AND 3100 SOUTH IS REOPENED: Traffic is now open NB and SB. Crews continue to work on the shoulder, so drive carefully in this work zone.

3100 South: Construction continues on 3100 South directly east of the 7200 West intersection. Expect median closures and intermittent lane restrictions at that intersection.

3300 South: Crews continue to bore between 900 West and 1100 West. Construction activity continues in the area east of Redwood Road. Expect median closures and traffic restricted to two lanes EB and WB.

3500 South: Mainline construction continues between 5600 West and 6600 West. Pipe is scheduled to be pulled through the bore at 6000 West early in the week. Traffic control is in place along this narrow road (including one-way restrictions described above), so please drive carefully or choose alternate routes, if possible.

arrow Sept 26, 2008 UPDATE

ALERT!
24-HOUR LANE RESTRICTIONS ON 3500 SOUTH BETWEEN 5600 WEST AND 6000 WEST: Effective Monday, Sept. 22, traffic in this section will alternate ONE-WAY ONLY EB and WB. Traffic in each direction will be regulated by a timed, electronic flagger and limited to ONE-WAY only in both directions. Expect substantial delays. Choose alternate routes, if possible. These restrictions will be in effect 24 hours for the next 10 to 14 days.

CLOSURES ON 2600 SOUTH, 2700 SOUTH, 2890 SOUTH and 3100 SOUTH AT 8000 WEST: Traffic on 8000 West between 3100 South and 2600 South is restricted to one lane NB only. Left-hand turns are permitted WB onto 2700 South and right-hand turns are permitted EB onto 2600 South.  Traffic may turn right onto EB 2890 South and turn right from 2890 South and 2700 South onto NB 8000 West.

As there are school crossings in this area, please use great caution.

3100 South: Construction continues on 3100 South directly east of the 7200 West intersection. Expect median closures and intermittent lane restrictions at that intersection. Refer to the alert below for restrictions at 8000 West.

3300 South: Crews are working on the bore between 900 West and 1100 West. Drive carefully in this zone. Construction activity continues in the area east of Redwood Road. Expect median closures and traffic restricted to two lanes EB and WB. Some shoulder work will also be done. There are no turn restrictions at the intersection of 3300 South and Redwood Road. Although work is completing in this area, crews will return in the near future to make final tie-ins.

3500 South: Mainline construction will continue between 5600 West and 6600 West. Traffic control is in place along this narrow road (including one-way restrictions described above), so please drive carefully or choose alternate routes, if possible.

arrow Sept 19, 2008 UPDATE

ALERT!
24-HOUR LANE RESTRICTIONS ON 3500 SOUTH BETWEEN 5600 WEST AND 6000 WEST: Effective Monday, Sept. 22, traffic in this section will alternate ONE-WAY ONLY EB and WB. Traffic in each direction will be regulated by a timed, electronic flagger and limited to ONE-WAY only in both directions. Expect substantial delays. Choose alternate routes, if possible. These restrictions will be in effect 24 hours for the next 10 to 14 days.

CLOSURES ON 2600 SOUTH, 2700 SOUTH, 2890 SOUTH and 3100 SOUTH AT 8000 WEST: Traffic on 8000 West between 3100 South and 2600 South is restricted to one lane NB only. Left-hand turns are permitted WB onto 2700 South and right-hand turns are permitted EB onto 2600 South. Traffic may turn right onto EB 2890 South and turn right from 2890 South and 2700 South onto NB 8000 West. SB traffic on 8000 West from 2600 South to 3100 South is expected to be restored on Wednesday, Oct. 1.

As there are school crossings in this area, please use great caution.

3100 South: Construction continues on 3100 South directly east of the 7200 West intersection. Expect median closures and intermittent lane restrictions at that intersection. Refer to the alert below for restrictions at 8000 West.

3300 South: Construction activity continues in the area east of Redwood Road. Expect median closures and traffic restricted to two lanes EB and WB. Some shoulder work will also be done. There are no turn restrictions at the intersection of 3300 South and Redwood Road. Although work is completing in this area, crews will return in the near future to make final tie-ins.

3500 South: Mainline construction will continue between 5600 West and 6600 West. Traffic control is in place along this narrow road (including one-way restrictions described above), so please drive carefully or choose alternate routes, if possible.

arrow Sept 12, 2008 UPDATE

ALERT! CLOSURES ON 2600 SOUTH, 2700 SOUTH, 2890 SOUTH and 3100 SOUTH AT 8000 WEST:

Between 3100 South and 2600 South on 8000 West traffic is confined to northbound only. Left-hand turns are permitted at 2700 South and right-hand turns are permitted at 2600 South. Traffic may turn right onto westbound 2890 South and turn right from 2890 South onto northbound 8000 West.

Between 2600 South and Highway 201 on 8000 West traffic is confined to southbound only. Southbound traffic on 8000 West is permitted left-hand turns at 2600 South and right-hand turns at 2700 South.

Westbound traffic on 2700 West is permitted left-hand turns only into northbound 8000 West.

As there are school crossings in this area, please use great caution.


3100 South: Construction continues on 3100 South directly east of the 7200 West intersection. Expect median closures and intermittent lane restrictions at that intersection. Refer to the alert below for restrictions at 8000 West.

3300 South: Construction activity continues in the area east of Redwood Road. Expect median closures and traffic restricted to two lanes EB and WB. Some shoulder work will also be done. The median and WB left-hand lane are closed in this section. Although work is completing in this area, crews will return in the near future to make final tie-ins.

3500 South: Currently no left-turns are allowed for traffic at 3600 West. No left-turns are allowed from 4700 West just past 4800 West. There is one lane of traffic in each direction from 6300 West to 6500 West, allowing no left- or right-hand turns at 6400 West. Crews are working at 6700 West, the entrance to the Hunter Park Village parkway.

arrow Sept 5, 2008 UPDATE

ALERT! CLOSURE OF 8000 WEST BETWEEN 2700 SOUTH AND 3100 SOUTH: Starting Monday, Aug. 25, 8000 West will be closed and restricted to local access only from 2700 South to 3100 South while new pipe is installed. This section of 8000 West is expected to be closed for at least two more weeks while construction is completed.

3100 South: Major construction continues between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. Crews will also be working to install pipe across the 7200 West intersection. Expect intermittent lane restrictions NB and SB on 7200 West at 3100 South.

3300 South: Construction activity continues between 900 West and 1100 West. Expect median closures and traffic restricted to two lanes EB and WB. Crews are also set up and working to install pipe and a valve assembly from Redwood Road and about 1000 feet east. Some shoulder work will also be done. The median and WB left-hand lane are closed in this section.

3500 South: Mainline construction continues between 5600 West and 6800 West. Expect median closures and intermittent lanes restrictions EB and WB. Also expect intermittent lane restrictions NB and SB on 5600 West and 6400 West at 3500 South during daytime hours. Work to install a new 6-inch plastic main line on 3500 South from 8000 West to 8400 West continues. Expect intermittent lane restrictions in the work zone. Traffic may be restricted to one lane in either direction at times. Watch for flaggers.

arrow August 29, 2008 UPDATE

NOTE: There will be no construction activity this weekend in observance of the Labor Day holiday. Work will resume on Tuesday, Sept. 2.

2700 South: Pipe has been installed between 8200 West and 8000 West. Final cleanup and paving will continue next week. Expect median closures and intermittent lanes restrictions EB and WB.

3100 South: Major construction will continue between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. Crews will also be working to install pipe across the 7200 West intersection. Expect intermittent lane restrictions NB and SB on 7200 West at 3100 South.

3300 South: Construction activity continues between 700 West and 1100 West. Expect median closures and traffic restricted to two lanes EB and WB.

3500 South: Mainline construction continues between 5600 West and 6800 West. Expect median closures and intermittent lanes restrictions EB and WB. Also expect intermittent lane restrictions NB and SB on 5600 West and 6400 West at 3500 South during daytime hours. Work to install a new 6-inch plastic main line on 3500 South from 8000 West to 8400 West continues. Expect intermittent lane restrictions in the work zone. Traffic may be restricted to one lane in either direction at times. Watch for flaggers.

ALERT! CLOSURE OF 8000 WEST BETWEEN 2700 SOUTH AND 3100 SOUTH: Starting Monday, Aug. 25, 8000 West will be closed and restricted to local access only from 2700 South to 3100 South while new pipe is installed. This section of 8000 West is expected to be closed for at least two more weeks while construction is completed.

arrow August 15, 2008 UPDATE

 2700 South: Major construction will continue between 8200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB.

3100 South: Major construction will continue between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. 

3300 South: Construction activity, including re-paving, continues between 300 West and 900 West. Pipe has been pulled through the extended bore from 900 West to 700 West and crews will perform tie-in work at 700 West. On Monday, crews will begin an extended bore from 1100 West to 900 West. Expect median closures and traffic restricted to two lanes EB and WB.

3300/3500 South: Cleanup, repaving, tie-ins and major construction continues between 1000 West and Redwood Road. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB.

3500 South: Mainline construction continues between 5200 West and 6800 West. Expect median closures and intermittent lanes restrictions EB and WB. Starting Sunday, crews will work nights from 7 p.m. to 5 a.m. to cross the intersection at 5600 West. Expect intermittent lanes restrictions NB and SB on 5600 West at 3500 South during these hours. Work to install a new 6-inch plastic main line on 3500 South from 8000 West to 8400 West continues. Expect intermittent lane restrictions in the work zone.

ALERT! Scheduled Closure of 8000 West from 2700 South to 3100 South: To facilitate construction of pipe on 8000 West, the road will be closed and restricted to local access only between 2700 South and 3100 South. The closure is tentatively scheduled to begin Monday, Aug. 25, pending completion of a non-Questar Gas project on 2700 South. Installation of pipe on 8000 West is expected to take one to two weeks to complete.

arrow August 8, 2008 UPDATE

 3100 South – Major construction will continue between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. . 

3300 South –Installation of new pipe and tie-in work continues between 300 West and 900 West. Pipe is scheduled to be pulled through the extended bore from 900 West to 700 West this weekend. On Monday, crews will begin an extended bore from 100 West to 900 West. Expect median closures and traffic restricted to two lanes EB and WB.

3300/3500 South: Cleanup, repaving, tie-ins and major construction continues between 1000 West and Redwood Road. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB.

3500 South: Mainline construction continues between 5200 West and 6200 West. Expect median closures and intermittent lanes restrictions EB and WB. Crews will complete paving at the 4800 West intersection. Expect intermittent lanes restrictions NB and SB on 4800 West at 3500 South. On Monday, a separate crew will begin work to install a new 6-inch plastic main line on 3500 South from 8000 West to 8400 West. Expect intermittent lane restrictions in the work zone.

ALERT! Scheduled Closure of 8000 West from 2700 South to 3100 South: To facilitate construction of pipe on 8000 West, the road will be closed and restricted to local access only between 2700 South and 3100 South. The closure is tentatively scheduled to begin the middle of next week, pending completion of a non-Questar Gas project on 2700 South. Installation of pipe on 8000 West is expected to take one to two weeks to complete once it begins.

arrow August 1, 2008 UPDATE

Hunter Park Village –Sod replacement is complete and final concrete replacement on the pathway is expected to be finished by Friday, Aug. 8.

 3100 South – Major construction is underway between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. 

3300 South – Installation of new pipe and tie-in work continues between West Temple and 900 West. Crews are conducting an extended bore from 900 West to 700 West. Expect median closures and traffic restricted to two lanes EB and WB.

3300/3500 South: Cleanup, repaving, tie-ins and major construction continues between 1000 West and Redwood Road. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB.

3500 South: Mainline construction continues between 4800 West and 6200 West. Expect median closures and intermittent lanes restrictions EB and WB. Crews will continue work at the 4800 West intersection. Expect intermittent lanes restrictions NB and SB on 4800 West at 3500 South.

ALERT! Scheduled Closure of 8000 West from 2700 South to 3100 South: To facilitate construction of pipe on 8000 West, the road will be closed and restricted to local acess only between 2700 South and 3100 South. The closure is tentatively scheduled to begin in about two weeks, pending completion of a non-Questar Gas project on 2700 South. Installation of pipe on 8000 West is expected to take a week once work begins. Stay tuned.

arrow July 25, 2008 UPDATE

To accommodate Pioneer Day celebrations, crews stopped work midday Wednesday, July 23, and will resume Monday, July 28.


Hunter Park Village – Sod replacement continues. Restoration of the entire parkway is expected to be finished by Aug. 15.  

3100 South –
Major construction is underway between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB.

3300 South
– Installation of new pipe and tie-in work continues between West Temple and 500 West. Crews pulled pipe through the bore between 500 West and 700 West.

3300/3500 South – Cleanup, repaving and major construction continues between 1000 West and Redwood Road. The Redwood bore is complete. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB.

3500 South
– Mainline construction continues between 4400 West and 6000 West. Expect median closures and intermittent lanes restrictions EB and WB. Crews will continue work at the 4400 West and 4800 West intersections. Expect lanes restrictions NB and SB on 4800 West at 3500 South. Additionally, crews will begin night work between 7 p.m. and 5 a.m. at the 5600 West intersection with lane restrictions NB and SB on 5600 West at this location.

arrow July 18, 2008 UPDATE

Hunter Park Village – The new asphalt path has been installed. Sod replacement is underway. A completed section will open next week with subsequent sections opening as they are finished. Restoration of the entire parkway is expected to be finished by Aug. 15.  

3100 South –
Major construction is underway between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB. 

3300 South
– Installation of new pipe and tie-in work continues between West Temple and 500 West. Crews are scheduled to pull pipe through the 500 West bore on Sunday. Watch for median closures and lane restrictions EB and WB in this section. Beginning Sunday, and through Tuesday, NB and SB traffic on 300 West will be closed at 3300 South each night from 7 p.m. until 5 a.m. the following morning to allow crews to trench across the intersection. The intersection will be open all night beginning Wednesday and through the July 24 holiday and weekend.

3300/3500 South: Cleanup, repaving and major construction continues between 1000 West and Redwood Road. A bore crew is set up and working at Redwoood Road. Crews are scheduled to pull pipe through the bore Monday or Tuesday. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB. 900 West will be closed to NB and SB traffic at 3300 South on Saturday from 4 p.m. until Sunday evening to allow crews to complete tie-ins.

3500 South
: Mainline construction continues between 4400 West and 6000 West. Expect median closures and intermittent lanes restrictions EB and WB. On Monday, crews will begin working at the 4800 West intersection. Expect lanes restrictions NB and SB on 4800 West at 3500 South. Additionally, crews will begin night work between 7 p.m. and 5 a.m. at the 5600 West intersection with lane restrictions NB and SB on 5600 West at this location.

arrow July 11, 2008 UPDATE

Hunter Park Village – The new asphalt path has been installed. Sod replacement is underway and will continue. The estimated completion date is Aug. 15. Portions of the right-of-way will be opened as they become finished.

3100 South – Major construction will begin between 7200 West and 8000 West. Expect median closures and intermittent lanes restrictions EB and WB.

3300 South – Installation of new pipe and tie-in work continues between West Temple and 500 West. A bore crew will be working at 500 West. Watch for median closures and lane restrictions EB and WB in this section.

3300/3500 South - Cleanup, repaving and major construction continues between 1000 West and Redwood Road. A bore crew is set up and working at Redwoood Road. Median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB. Work to cross the 2200 West intersection will be completed. No night work is scheduled for Monday or Tuesday during the American Idol concerts at the E Center. At least one (hopefully two) left-turn lanes will be open EB on 3500 South turning NB on Decker Lake Blvd to accommodate concert traffic.

3500 South: Mainline construction continues between 4400 West and 6000 West. Expect median closures and intermittent lanes restrictions EB and WB.

arrow June 27, 2008 UPDATE

Note: Due to the July 4 holiday, next week will be a short work week. Crews will be off from Thursday, July 4, through Sunday, July 6. Construction activity will resume on Monday, July 7. Due to the holiday, there will be no weekly update issued July 5. The updates will resume on Friday, July 11.

Hunter Park Village – Restoration of the right-of-way has been delayed due to a miscommunication between the city and the contractor that resulted in the new asphalt being installed without the proper roadbed foundation. Consequently, the city has requested that the contractor remove the asphalt already installed and start over. Work has begun on the south end of the park (at 3500 South) and will proceed northwest with an estimated completion date of Aug. 15. Portions of the path will be opened as they become finished..

3300 South – Major construction continues between State Street and 500 West, including the bores under TRAX and I-15. Watch for median closures and lane restrictions EB and WB in this section

Cleaning and pressure testing of the new section of pipe from 2700 to State Street will continue. A temporary pig launcher and compressor have been set up at 2700 East. Limited traffic control is in effect at this location

3300/3500 South - Cleanup, repaving and major construction continues between 1000 West and Redwood Road. Consequently, median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB. No left-turn restrictions at I-215 where crews will be working at night to minimize impacts on motorists. Work to cross the 2200 West intersection is scheduled to be complete by midweek.

3500 South: Mainline construction continues between Bangerter Highway and 4800 West. Expect median closures and intermittent lanes restrictions EB and WB.

arrow June 20, 2008 UPDATE

Hunter Park Village – Re-asphalting of the walking path continues.

3300 South – Major construction continues between State Street and 500 West, including the bores under TRAX and I-15. Watch for median closures and lane restrictions EB and WB in this section.

Cleaning and pressure testing of the new section of pipe from 2700 to State Street will continue. A temporary pig launcher and compressor have been set up at 2700 East. Limited traffic control is in effect at this location.

3300/3500 South: Cleanup, repaving and major construction continues between 1000 West and Redwood Road. Consequently, median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB. No left-turn restrictions at I-215 where crews will be working at night to minimize impacts on motorists. Work to cross the 2200 West intersection is scheduled to be complete by midweek.

3500 South: Mainline construction continues between Bangerter Highway and 4800 West. Expect median closures and intermittent lanes restrictions EB and WB. 

arrow June 13, 2008 UPDATE

Copper Club Golf Course (8950 West 2600 South) – Sod replacement is still being delayed due to weather, but should be completed next week.

Hunter Park Village – Re-asphalting of the walking path continues. Sod replacement is expected to be finished next week.

3300 South – Major construction continues between 200 East and 500 West, including the bores under TRAX and I-15. Watch for median closures and lane restrictions EB and WB in this section.

The new section of pipe from 2700 to State Street will be cleaned and pressure tested. A temporary pig launcher and compressor have been set up at 2700 East. Crews are also tying in the new line to an existing line at the 2300 East intersection. Limited traffic control is in effect at these two locations

3300/3500 South: Cleanup, repaving and major construction continues between 1000 West and Redwood Road. Consequently, median closures and lane restrictions remain in effect with traffic limited to two lanes EB and WB. No left-turn restrictions at I-215 where crews will be working at night to minimize impacts on motorists. Work to cross the 1940 West intersection is scheduled to be complete by midweek..

3500 South: Mainline construction is underway between Bangerter Highway and 4800 West. Crews also continue to relocate gas- and water-service lines to individual businesses and residences between 5200 West and 5600 West. Expect median closures and intermittent lanes restrictions EB and WB.

arrow June 6, 2008 UPDATE

Copper Club Golf Course (8950 West 2600 South) – Sod replacement has been delayed due to weather, but is expected to be complete next week.

Hunter Park Village – Re-asphalting of the walking path continues. Sod replacement is expected to finish next week.

3300 South – Major construction continues between 200 East and 500 West, including preparation to bore under TRAX and completing the bore under I-15. Watch for median closures and lane restrictions EB and WB.

3300/3500 South: Cleanup, repaving and major construction continues between 1000 West and 2700 West. Consequently, median closuresand lane restrictions remain in effect with traffic limited to two lanes EB and WB. No left-turn restrictions at I-215.

3500 South: Between Bangerter Highway and 4800 West crews continue to relocate gas- and water-service lines to individual businesses and residences. Major construction in this section is slated to begin. Expect median closures and intermittent lanes restrictions EB and WB.